First, I should note that I'm still in school and so have to study a fair amount. Doing that at the build space means that when I need a break I can do some work on the cottage. But it has the down side of occasionally distracting me from my school work. :-)
Arlene has done most of the work of putting the floor framing together. In the photo below you can see that we used treated wood around areas that will be more likely to be exposed to water. There a few more photos of the floor framing here.
Originally we intended to build the floor frame next to the trailer on the shop floor. That is, in fact, how the plans suggest you do it. However, the dimensions of our trailer are different than the plans expect. So if we built the floor frame exactly as the plans suggest we'd be disappointed when we put it on the trailer and found it didn't fit. Measuring and setting up the frame on the trailer made more sense. We could adjust as we went. So the tip here, if you building one of these, is to measure measure measure.
Now, we still have to work out some issues around leveling, but more on that later.
And finally, here I am sanding out the inside of the wine barrel.
Are you wondering what we have a wine barrel for? Me too.
New corner store Market off Market opens in Ballard
-
There’s a new corner store at 1100 NW 54th St: Market off Market opened its
doors a week ago in Ballard. Ballatdite Alex Garmendia is the owner
of Market o...
2 hours ago
No comments:
Post a Comment
Leave us a comment! We'd love to hear from you!